lNeeded
controls are dependent upon nature or risks (including size of operation)
–Refurbishment: Lower risks, thus lesser controls
–Dismantling & Raw Material Recovery: Greater
risks, thus greater controls
lThus,
flexibility needed in the application of Core Performance Elements